检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海电力学院电力与自动化工程学院,上海200090
出 处:《上海电力学院学报》2011年第6期539-543,共5页Journal of Shanghai University of Electric Power
基 金:国家自然科学基金(50907039;50977055);上海市教育委员会科研创新项目(12ZZ178)
摘 要:分布式电源引入使电网规划面临更多不确定因素.目前,对含分布式电源的电源规划和电网扩展规划进行的研究较多,但对规划的结果缺乏系统性的评估.在前人研究的基础上,总结了一套具有实用价值的分布式电源的电网规划评估体系.The infiltration of distributed power makes the power network planning face more uncertainties. Currently, there are many research models and algorithms for power planning and power network expansion planning containing DG, but the planning results lack the systematic evaluation system. Therefore, an evaluation and analysis system based on previous studies for network planning containing DG is proposed with certain practical merit. The evaluation which is applied in the power network is comprehensive, objective and effective. Besides, relatively good academic and practical sense.
分 类 号:TP273.5[自动化与计算机技术—检测技术与自动化装置] TM727[自动化与计算机技术—控制科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.77