检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘剑[1] 黄小庆[1] 曹一家[1] 黎灿兵[1]
机构地区:[1]湖南大学电气与信息工程学院,长沙410082
出 处:《电力系统及其自动化学报》2011年第6期22-28,共7页Proceedings of the CSU-EPSA
基 金:国家十一五科技支撑计划(2009BAG12A09)
摘 要:随着电气化铁路的加速建设,电铁电能质量治理问题日益突出。针对电气化铁路负序电流和三相电压不平衡以及谐波问题,提出了一种基于三相静止无功补偿器(SVC)的电能质量综合治理方案。该方案不同于国内现有的两相式SVC和接入高压侧的三相SVC,将三相SVC接入牵引变电站的低压侧,重点补偿负序和无功,同时治理谐波。仿真结果表明,该方案能有效抑制负序、谐波和进行无功补偿。With the accelerated construction of electrified railway, power quality management has become an increasingly important issue. To solve the problems of the serious negative sequence current, three-phase voltage unbalance and harmonics brought by electrified railway , a set of new program for power quality was proposed. This program is different from the domestic two-phase static var compensator (SVC) and the three-phase SVC accessed to high-voltage side of traction substation. The program based on the three-phase SVC accessed to the low-voltage side of the traction substation, which focus on compensating the negative sequence and the reactive power. Simulation results show that this program can effectively inhibit the negative sequence, harmonics and compensate reactive power.
关 键 词:静止无功补偿器 电气化铁路 谐波 负序 电能质量
分 类 号:TM714[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171