检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范重[1] 刘先明[1] 范学伟[1] 李丽[1] 彭翼[1]
出 处:《建筑科学与工程学报》2011年第4期19-25,共7页Journal of Architecture and Civil Engineering
基 金:"十一五"国家科技支撑计划项目(2004BA904B01);北京市科技计划项目(H050630210720)
摘 要:通过用千斤顶反力之和表征卸载上顶力、用支撑塔架顶部的下降量平均值表征卸载变形,提出了大跨度钢结构卸载施工的仿真计算方法。研究结果表明:该方法可以有效消除施工过程中各千斤顶的上顶量偏差、下降量偏差等多种因素的影响,便于实测值与理论计算值进行对比,为指导大跨度钢结构卸载施工提供了科学依据。By using total reaction force of jack to denote the uplifting force, and the top average decrease of temporary supporting tower to denote sinking during unloading process, a simulation and calculation method of unloading process of long-span steel structures was proposed. The study results show that the method can effectively eliminate the effects of various factors, such as the deviation of uplifting and sinking amount of each jack, and he convenient for comparing the measured values with the theoretical calculation values. The method can provide scientific references for guiding unloading construction of long-span steel structures.
分 类 号:TU245.4[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.172.36