开采顺序对采场稳定性及地表沉降影响的数值模拟研究  被引量:9

Numeric Simulation for the Influence of Mining Sequence on Stope Stability and Ground Settlement

在线阅读下载全文

作  者:任卫东[1,2] 陈建宏[1] 

机构地区:[1]中南大学资源与安全工程学院,湖南长沙410083 [2]长沙有色冶金设计研究院有限公司,湖南长沙410011

出  处:《矿冶工程》2011年第6期21-24,共4页Mining and Metallurgical Engineering

摘  要:结合采矿方法创建了回采过程数值计算模型,采用有限元分析软件对不同开采顺序下的采场顶底板应力、位移等情况进行了模拟计算,同时对不同开采方案引起的地表位移情况进行了分析,最终确定了最优的回采顺序及开采方案。研究结果可为矿山的安全、高效生产提供技术指导和决策依据。A numerical calculation model was established for stoping based on the mining method. Simulation calculations were conducted using finite element analysis software for the stress of stope's roof and floor, as well as the displacement situation based on different mining sequences. Meanwhile, surface displacement caused by different mining methods was analyzed. An optimal stoping sequence and a mining program were finalized. It can provide some technical guidance for the safety and efficient production on mine.

关 键 词:开采顺序 采场稳定性 地表沉降 有限元分析 

分 类 号:TD853[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象