检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵智平
机构地区:[1]大西铁路客运专线有限责任公司,太原030027
出 处:《铁道标准设计》2011年第B12期83-86,共4页Railway Standard Design
摘 要:结合大西客运专线部分连续梁需要冬季施工的要求,根据冬季施工相关规定和特点,重点介绍了挂篮封闭蒸养暖棚设计技术,对连续梁冬季混凝土施工等进行了热工计算,并总结了冬季施工的安全施工要点。采取挂篮全封闭蒸养施工,蒸汽养护效果明显,每个节段施工周期为7~9 d,混凝土浇筑4 d后达到张拉强度。Considering the construction requirements of a part of continuous beams in winter on Datong-Xi'an PDL,according to relevant regulations and features of winter construction,the paper emphatically introduces the design techniques of closed hanging basket for warm shed of steam curing and related thermo-engineering calculations,summarizes the key points of safty construction in winter.The effect of closed hanging basket steam curing was obvious,the curing period for each section accounted 7~9 days,concrete 4d strength after casting was adquate for tensioning.
分 类 号:U448.215[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104