检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2011年第B12期27-28,共2页Northwest Hydropower
摘 要:柬埔寨甘再水电站为BOT开发模式,该模式对设计单位提出了一些新问题,因此需要认真研究如何更好地处理这些问题、提高设计产品质量。同时,在设计开始阶段,尽早做好相关资料的收集和准备,对加快建设进度将产生积极的作用。对上述问题从设计角度进行了简要总结和分析。The Kamchay hydropower station in Cambodia is developed in BOT mode, which puts forward some new challenges to the Designer. Therefore, it shall be carefully studied how to better address these challenges and improve the quality of design products. Meanwhile, at the beginning of design, relative data shall be collected and prepared as early as possible, which will have a positive effect on accelerating the construction speed. The paper summarizes and analyzes the above issues from the view point of design.
关 键 词:柬埔寨甘再水电站BOT 设计 新问题 处理思路
分 类 号:TV22[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3