甘再水电站出线塔架设计  被引量:1

Design of outgoing line towers for Kamchay hydropower station

在线阅读下载全文

作  者:屈洁[1] 詹振彪[1] 王化恒[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2011年第B12期29-31,共3页Northwest Hydropower

摘  要:柬埔寨甘再水电站是以BOT模式承建的工程,为大型二等工程。包括3个发电厂房。其中PH1和PH2电站分别采用了GIS户内开关站、户外开敞式出线站的形式。厂顶及户外的出线塔架在设计上各有其特点。通过结合参照相似工程,对本工程塔架在设计中遇到的相关问题进行了总结。Kamehay hydropower station in Cambodia is a large-size (2) project constructed in BOT mode. It is composed of 3 power plants, of which PH1 and PH2 plants are respectively provided with GIS indoor switchyard and outdoor open-type outgoing line station. The outgoing line towers on the powerhouse top and at outdoor have their own features in design. With reference to similar projects, the paper analyzes the problems encountered during design of the towers for the project.

关 键 词:柬埔寨甘再水电站 PH1 PH2 出线塔架 总结 

分 类 号:TV34[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象