甘再PH1水电站尾水布置方案优化  被引量:1

Optimization of layout option for tailwater system of Kamchay PH1 power plant

在线阅读下载全文

作  者:刘博[1] 王伟[1] 王化恒[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2011年第B12期49-52,共4页Northwest Hydropower

摘  要:柬埔寨甘再水电站PH1尾水系统,目前存在现场开挖地质条件复杂、雨季降雨时间长、施工工期短等因素制约,在设计尾水方案过程中充分考虑这些因素,利用施工围堰再改造,最终使尾水建筑物设计方案技术可行、经济合理、施工方便。For the tailwater system of Kamchay PH1 power plant, there are constraints such as complicated geological conditions encountered during site excavation, long time rainfall at wet season and short construction period. Full considerations were given to the above factors in the design of tailwater system option. Through reconstruction of the construction cofferdam, the design option of tailwater structure was feasible in technology, reasonable in economy and ease for construction.

关 键 词:尾水 布置方案 方案优化 甘再PH1水电站 

分 类 号:TV672[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象