检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《热力发电》2012年第1期56-60,64,共6页Thermal Power Generation
摘 要:对国华宁海电厂6号1 000MW机组大修后辅机故障快速减负荷(RB)试验过程中的过热蒸汽温度、汽水分离器出口蒸汽温度、炉膛压力、磨煤机入口一次风量等控制进行了优化,优化后的控制策略更加完善。同时,试验表明该机组RB控制品质仍有提高的空间,特别是主蒸汽温度的控制品质还可继续提高。The controlled parameters during run back (RB) test process of unit no6 in Guohua Ninghai Power Plant after major repair, such as the temperature of superheated steam, the temperature of outlet steam from steam- water separator,the pressure in furnace,and the flow rate of primary air into the coal mill etc. , have been optimized. After optimization, the control strategy is more perfected, at the same time,the test shows that the RB control quality of said unit still has space to be enhanced,partic-ularly the control quality of main steam temperature can be continuously enhanced.
关 键 词:超超临界 1 000 MW机组 RB试验 过热蒸汽温度 磨煤机入口一次风量 炉膛压力 燃水比 焓值校正
分 类 号:TK323[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40