红花水电站第一年枯水期施工导流模型试验研究  被引量:2

First dry-period construction diversion model test for Honghua Hydropower Station

在线阅读下载全文

作  者:王建平 任作义 刑方亮 

机构地区:[1]珠江水利科学研究院,广东广州510611 [2]广西右江水利开发有限责任公司,广西百色530012

出  处:《广西水利水电》2011年第6期1-3,8,共4页Guangxi Water Resources & Hydropower Engineering

摘  要:建立红花水电站施工导流物理模型,对红花水电站第一年枯水期的施工导流方案进行试验研究,优化了该阶段左右岸挡水围堰的施工顺序和明渠开挖方案,使导流明渠满足度汛和通航的要求,并减少了第一年枯水期施工导流方案的工程量。Physical model was constructed to test and study the first dry-period construction diversion scheme for Honghua Hydropower Station. Based on the testing results, the construction programs of left and right water retaining cofferdams as well as the open channel excavation scheme were optimized, which not only renders less construction quantities, but also lead to the diversion open channel meet requirements for flood relief and navigation simultaneously.

关 键 词:施工导流 试验 红花水电站 

分 类 号:TV139.16[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象