黄河康扬水电站坝体填筑质量控制与检测  

Control and Inspecting Test of Dam Filling Pouring Quality of Kangyang Hydropower Station of Yellow River

在线阅读下载全文

作  者:樊伟东 

机构地区:[1]青海省水利水电科学研究所,青海西宁810012

出  处:《城市道桥与防洪》2011年第12期94-97,8+7,共4页Urban Roads Bridges & Flood Control

摘  要:该文通过对坝体砂砾料填筑采用ρd-P5-Dr三因素相对密度质量控制和坝体壤土防渗斜墙采用干密度质量控制,严格执行建设监理监督机制,达到优质工程质量的实例,经5 a安全运行检验,取得了显著的经济效益和社会效益。该项技术可为类似条件的工程开发建设的质量控制,提供参考和借鉴。The article introduces the quality control of filling and pouring the grit of dam with the relative densities of three factors ρd-P5-Dr and the quality control of the dam soil preventing the inclined wall from seepage with the dry density,the strictly implemented supervision system of construction,and the practical cases of the projects up to the high quality.The obvious economic benefit and social benefit are achieved by the inspection test of safe operation for five years,which can be referred for the quality control of the similar engineering development and construction.

关 键 词:康扬水电站 坝体填筑 相对密度 干密度 质量控制 

分 类 号:TV641[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象