检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南理工大学能源科学与工程学院,河南焦作454000 [2]义马煤业集团股份有限公司常村煤矿,河南义马472431
出 处:《煤炭科学技术》2012年第1期38-41,共4页Coal Science and Technology
摘 要:以常村煤矿21132工作面上巷为例,用理论分析并辅以工程类比的方法,研究了全煤深部大断面高应力条件下锚网索架工字钢棚联合支护围岩变形的控制效果,优选了巷道支护参数,即锚杆长度为2.4 m,间排距为0.6 m,工字钢棚间距为0.4 m;并进行了现场试验。试验结果表明:采用锚网索架工字钢棚联合支护,提高锚杆预应力,打设顶、底角锚杆及顶部锚索能有效控制巷道变形,增强巷道的稳定性。Taking the upper gateway of No.21132 coal mining face in Changcun Mine as an example,the theoretical analysis and the engineering analogy method were applied to study the control effect of the surrounding rock deformation with the bolt/steel mesh/anchor/H type steel shield combined support under the condition of high stress in the large cross section of deep full seam and optimize the support parameters of the gateway.The length of the bolt was 2.4 m,the space between the rows was 0.6 m and the space between the H type steel shields was 0.4 m.A site experiment was conducted.The experiment results showed that the application of the bolt/steel mesh/anchor/H type steel shield combined support could improve the pre-stress of the bolt.The bolt applied in the roof and floor and the roof anchor could effectively control the deformation of the gateway and improve the stability of the gateway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229