机构地区:[1]江苏科技大学土木工程与建筑学院,江苏镇江212003 [2]华普建设监理有限责任公司,江苏镇江212003
出 处:《施工技术(下半月)》2011年第12期54-56,共3页Construction Technology
摘 要:某半干船坞坞室基坑开挖深度为7.21~8.77m,采用水泥土搅拌桩作基坑支护,同时作为船坞的永久防渗墙。基坑开挖范围内有淤泥质土,现场进行钻孔取样得到水泥土抗压强度,确定采用深层搅拌水泥土可以成桩。由于基坑边长近280m,水泥土搅拌桩每隔15m设置一个加强墩防止产生长边效应,减小水泥土墙的水平位移,并采用深层搅拌桩满堂加固。实践证明,开挖过程中位移较小,应用效果良好。The foundation excavation depth of some half-interior of dry dock is about 7.21~8.77m.Cement-soil mixing pile is adopted as supporting structure and permanent cutoff wall of the foundation excavation.Because of muddy layers in the excavation range,compress strengthen of the cement-soil mixing pile is gained with field test to prove the feasibility of piles.Reinforcing piers is designed per 15m along the side to prevent long-side effect as the length of the foundation excavation is 280m and to reduce the horizontal displacement of cement-soil mixing piles.Moreover deep mixing piles is set at the bottom of foundation excavation.The displacement of foundation excavation can meet the requirements.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31