杨房沟水电站拱坝坝肩抗力体稳定性分析  

Stability analysis of arch dam abutment resisting mass in Yangfang hydropower station

在线阅读下载全文

作  者:刘克勤 柯柏荣 周会信 

机构地区:[1]福建华东岩土工程有限公司,福建福州350003 [2]江西省瑞昌市水利局,江西瑞昌332200

出  处:《福建建筑》2012年第1期84-87,共4页Fujian Architecture & Construction

摘  要:杨房沟水电站拱坝两岸Ⅳ、Ⅴ级结构面发育,特别是平行拱轴力的侧向结构面连通性较好,对坝肩抗滑稳定不利。本文分析两岸坝肩抗力体内可能组合块体,研究块体结构面的力学参数,查明其连通率,评价对坝肩抗力体的稳定影响。The IV,V level structural plane on both sides of the arch dam in Yangfang hydropower station,especially the lateral structural plane of parallel arch axis force has good connectivity,which is harmful to anti-slide stability of dam abutment.In this paper,possible combination of blocks in dam abutment resisting mass is analysed,mechanical parameters of the block structural plane is studied,the connecting rate is investigated and its influence on dam abutment resisting mass is evaluated.

关 键 词:拱坝 结构面 抗力体 稳定性分析 

分 类 号:TV642.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象