抄道沟水库侧槽式溢洪道除险加固设计  被引量:3

Design Research on Danger Control and Reinforcement Project of Side Channel Spillway of Chaodaogou Reservoir

在线阅读下载全文

作  者:牛利凯[1] 

机构地区:[1]河北省水利水电勘测设计研究院,天津300250

出  处:《水科学与工程技术》2011年第6期43-45,共3页Water Sciences and Engineering Technology

摘  要:侧槽式溢洪道除险加固工程设计不同于新建工程设计,是新建工程设计的一个逆过程。通过对已有建筑物尺寸的复核,结合现场实际地形情况,在尽可能不改变原有建筑物结构型式的前提下,确定合适的加固方案,以解决现有工程存在的问题。该文以抄道沟水库溢洪道加固设计为例,简要介绍侧槽式溢洪道加固设计。Different from the new project design,the design of side channel spillway used on danger control and reinforcement project is a inverse process of a new designed project.Based on the size review of the existing building,combined with the actual terrain scene,giving the proper reinforcement scheme to slove problems in the existing project under the permise of unchanging the structure of the former builing as much as possible.Take the reinforcement project of spillway of Chaodaogou seservoir as an example,the article introduces the design of the reinforcement project of side channel spillway briefly.

关 键 词:侧槽末端水深 临界水深 临界底坡 水面线 

分 类 号:TV651.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象