检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牛利凯[1]
机构地区:[1]河北省水利水电勘测设计研究院,天津300250
出 处:《水科学与工程技术》2011年第6期43-45,共3页Water Sciences and Engineering Technology
摘 要:侧槽式溢洪道除险加固工程设计不同于新建工程设计,是新建工程设计的一个逆过程。通过对已有建筑物尺寸的复核,结合现场实际地形情况,在尽可能不改变原有建筑物结构型式的前提下,确定合适的加固方案,以解决现有工程存在的问题。该文以抄道沟水库溢洪道加固设计为例,简要介绍侧槽式溢洪道加固设计。Different from the new project design,the design of side channel spillway used on danger control and reinforcement project is a inverse process of a new designed project.Based on the size review of the existing building,combined with the actual terrain scene,giving the proper reinforcement scheme to slove problems in the existing project under the permise of unchanging the structure of the former builing as much as possible.Take the reinforcement project of spillway of Chaodaogou seservoir as an example,the article introduces the design of the reinforcement project of side channel spillway briefly.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42