检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:隋晓
机构地区:[1]广州容柏生建筑结构设计事务所,广州510170
出 处:《广东土木与建筑》2011年第8期6-9,共4页Guangdong Architecture Civil Engineering
摘 要:预应力对斜拉空间网格结构受力体系的形成至关重要,如何通过分批张拉准确地建立预应力是施工中面临的主要问题,文中结合工程实例,从拉索的切线刚度和索长计算两个角度入手,分析了拉索的垂度对斜拉空间网格结构预应力张拉过程的影响。针对斜拉空间网格结构的特点,综合考虑各种因素的影响,提出了拉索张拉的控制原则和要求,并对施工方案进行了优化。Prcstrcssing force is the key factor for the supporting system of cable-stayed spatial reticulated structure. How to establish it is the main problem to solve in'the process of construction. In this paper, combining with a real example,the effect of cable sag on ten- sion process was analysed from two aspects of extensional rigidity and cable length calculation. According to the characteristics of ca- ble-stayed spatial reticulated structure,the corresponding principle and requirement of cable-tension was given considering effects of different factors. The tension scheme was optimized by comparing three different ways.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.55