检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张巨松[1] 金亮[1,2] 刘志鑫[1] 杨豹[1]
机构地区:[1]沈阳建筑大学材料科学与工程学院,辽宁沈阳110168 [2]沈阳兴禹水利建设工程质量检测有限公司,辽宁沈阳110168
出 处:《沈阳建筑大学学报(自然科学版)》2012年第1期116-122,共7页Journal of Shenyang Jianzhu University:Natural Science
基 金:国家自然科学基金项目(50274025);住房和城乡建设部科技攻关项目(2007-k4-19);沈阳地铁混凝土攻关项目(SW06-08-30)
摘 要:目的研究硫铝酸盐基土壤固化剂固化土的安定性、凝结时间、冻融循环性能,为公路工程提供一种新型土壤固化剂.方法土壤取用北方常见土(黑土、黄土),按照《土壤固化剂标准》(CJ/T 3073-1998)和《公路工程无机结合料稳定料试验规程》(JTJ057-94)的相关要求测试土壤固化剂对固化土的安定性、凝结时间、冻融循环性能.结果两种固化土经安定性试验,表面均完好无损.凝结时间试验中,黑土固化土强度损失9.2%,黄土强度损失8.92%,强度损失均小于10%.结论两种固化土安定性与凝结时间均符合相关标准要求.固化土经冻融循环后,与同类产品相比质量损失小,强度损失优于同类.固化土经安定性测试和冻融循环测试后,抗冻能力优于单独冻融循环.若在低温下施工,建议在早期改善养护条件、减短凝结时间、增长养护龄期,可以更好地达到固化土相关标准要求.This paper aims at the research on the solidified-soil, which be solidified by sulphoaluminate base soil stabilizer, soundness, Setting time, freeze-thaw cycles performances for providing a new soil stabilizer for Highway Engineering. The soil what we used is the northern common black soil and loess, and accordance with" the CJ/T 3073-1998 Soil stabilizer" and" JTJ057-94 Test Methods of Materials Stabilized with Inorganic Binders for Highway Engineering" of the relevant requirements of the soil stabilizer for the solidified-soil test of soundness, setting time, freeze-thaw cycles performances. Two kinds of solidified-soil surface are in- tact by soundness test. The strength loss of black soil solidified-soil was 9.2% and the strength loss of loess was 8.92% by setting time test,both less than 10% strength loss. Two kinds of solidified-soils soundness and setting time were all in line with relevant standards. Solidified soil after the freeze-thaw cycles comparing with the same kind products, quality loss and strength loss were less than the similar. The freezing capability of solidified soil was superior to the separate freeze-thaw cycles after the soundness testing and freezethaw cycles testing. If in low temperature construction, it is recommended to improve the early curing conditions to improve the setting time and increase the curing age, which can better achieve solidified soil in the related standard requirements.
分 类 号:TB321[一般工业技术—材料科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229