检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国核动力研究设计院信息中心,成都610041 [2]江苏核电有限公司田湾核电站,江苏连云港222042
出 处:《核动力工程》2012年第1期107-111,133,共6页Nuclear Power Engineering
摘 要:以田湾核电站的1#、2#机组第3循环堆芯装载图为例,介绍全进全出、堆内倒换和边进边出3种换料方法的操作过程,计算这3种换料方法的时间效率,分析比较3种换料方法的优缺点和适用场景。经田湾核电站实际换料验证,堆内倒换和边进边出换料方法是可行的,能显著提高换料效率。Refueling for the reactor core is a top priority for a nuclear power plant unit in the course of yearly refueling overhaul.Taking the fuel loading diagram for the 3rd cycle of No.1 and No.2 unit of Tianwan NPP as an example,this paper introduces the operation process for three refueling methods,i.e.,the all-in out,the shifting within core and chainre fueling.Time efficiency for these three refueling methods is estimated,and the advantages and applicable scenarios for these three refueling methods are analyzed and compared.The actual refueling operation for Tianwan NPP verified that the latter two refueling methods are feasible,and can greatly improve the efficiency of refueling.
分 类 号:TM623[电气工程—电力系统及自动化] TL384[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15