检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团成都勘测设计研究院,四川成都610072
出 处:《大坝与安全》2011年第5期33-37,共5页Dam & Safety
摘 要:溪洛渡水电站大坝深孔工作闸门为弧形闸门,采用4000kN/1000kN摇摆式液压启闭机操作。为适应闸门及启闭机制造、安装误差,启闭机的摇摆机架设计为同层双向十字摇摆式。小机架的四根支承横梁采用铸钢件,两两之间的联接为榫卯结构,其榫卯部位的受载情况较为复杂,传统力学方法的模型简化计算存在较大的困难,本文采用三维有限元方法对该机架的结构强度进行了验算分析。Radial gates for the deep orifices of Xiluodu dam are operated by 4 000 kN/1 000kN swing hydraulic hoist. To meet the requirements on the gates and hoist manufacturing, installation error, the hoist swing frame was designed as the same level two-way cross style. Four supporting beams of small frame were steel castings, connected by the tenon. It's com- plicated and difficult to use traditional mechanical method to simplify a suitable calculation model for the loading situa- tion of the tenon parts. The three-dimensional finite element method was adopted here to check and analyse the structural strength for the frame.
分 类 号:TV664.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.198.162