机构地区:[1]中国地质大学(武汉)工程学院,湖北武汉430074 [2]中水顾问集团贵阳勘测设计研究院,贵州贵阳550081 [3]水利部南京水利水文自动化研究所,江苏南京210012
出 处:《大坝与安全》2011年第5期59-64,67,共7页Dam & Safety
摘 要:格里桥水电站下闸蓄水后不久,实施了引水隧洞充水与放空试验,经历了充水-放空-再充水-再放空-再充水的过程,在此过程中渗压计的实测压力与充放水过程有明显相关性。因厂房后边坡变形较大,浇注灌注桩抗滑,通过灌注桩钢筋计实测应力的变化,判断抗滑效果及边坡稳定性,并对混凝土应力进行简单计算。Shortly after impoundment of Geliqiao hydropower station, the test of filling and emptying of the diversion tun- nel was carried out. In the filling-emptying-filling-emptying process, the pressure measured by piezometers had obvious relevance with the process. As large deformation of rear slope of powerhouse, concrete piles were poured for slide resis- tance. Strain gauges were arranged on the concrete piles to monitoring the stresses, further, to provide basis for evaluation of anti-sliding effect as well as judgment on slope stability. Moreover, the concrete stresses were calculated.
关 键 词:引水隧洞 压力 相关性 厂房后边坡 灌注桩 边坡稳定性
分 类 号:TV672.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28