检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《桥梁建设》2012年第1期54-59,共6页Bridge Construction
摘 要:荆岳长江公路大桥主桥为(100+298)m+816m+(80+2×75)m双塔非对称混合梁斜拉桥。在分析该桥主桥静力平衡特性的基础上,总结该类桥梁合理成桥状态的确定原则,并以此为指导采用RM2006空间杆系程序对该桥主桥进行结构总体静力分析。分析结果表明:该桥主梁钢箱梁段运营阶段上、下缘应力均以压应力控制,最大压应力分别为-135.40MPa和-134.88MPa,控制值基本相当;混凝土梁段上缘压应力最大为-17.32MPa,无拉应力出现;桥塔最大压应力为-15.56MPa,均满足规范要求。The main bridge of Jingyue Changjiang River Highway Bridge is a double-pylon asymmetric hybrid girder cable-stayed bridge with span arrangement(100+298) m+816 m+(80+2×75) m.On the basis of analysis of the static force equilibrium behavior of the main bridge,the principles for determination of rational completion status of the bridges of the same type were summarized,the principles were then taken as the guide and the structural global static force of the main bridge was analyzed,using the RM2006 Spatial Link Program.The results of the analysis show that at the operation stage,the stress of the upper and lower flanges of the steel box girder section of the main girder should be controlled by way of compressive stress control.The greatest compressive stress thereof is respectively-135.40 MPa and-134.88 MPa and the control values of the stress are almost equivalent.The greatest compressive stress of the upper flange of the concrete girder section is-17.32 MPa with no tensile stress and the greatest compressive stress of a pylon is-15.56 MPa,which can all meet the relevant requirements in the codes.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229