检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖龙正[1] 贾凯军[1] 郭楠楠[1] 戚洋[1]
机构地区:[1]中国矿业大学矿业工程学院,江苏徐州221008
出 处:《山西焦煤科技》2012年第1期21-24,32,共5页Shanxi Coking Coal Science & Technology
摘 要:长期以来,工作面过空巷是煤矿开采中难以解决的问题。传统的空巷支护方式不能有效地对顶板和煤壁提供足够的阻力或阻止围岩破坏范围的扩大。本文在分析工作面空巷围岩活动规律和超高水材料性能的基础上,论证了超高水材料充填空巷的可行性,并确定了充填体的力学参数和充填工艺。现场试验证明,采用超高水材料充填空巷是一种安全、经济、高效的方法,较传统空巷支护方法具有较大的优势。It is always a difficulty for the worki methods can not consolidate the crushed coals in both ng face passes through the abandoned raodway. The traditional sides of the abandoned workings or to maintain the rock stability of the abandoned workings successfully. The success of goaf filling methods with superhigh - water material offers a new choice for the supporting of abandoned workings. In this paper, based on the analysis for the law of surrounding rock of the abandoned roadway in the front of the working face and the superhigh - water material, the mechanical pa- rameters of backfilling mass and the filling system was defined. Successful practice shows the application of such back- fill material to abandoned roadway is a better solution than others to support abandoned roadway safely, economically and quickly.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117