工程施工合同价款诉讼时效争议研究  被引量:1

The Study on Limitation of Actions Controversial of Construction Contract Price

在线阅读下载全文

作  者:徐伟[1] 易波[2] 成于思[1] 沈杰[1] 

机构地区:[1]东南大学土木工程学院建设与房地产系,江苏南京210096 [2]东南大学法学院工程法研究所,江苏南京210096

出  处:《建筑经济》2012年第2期52-55,共4页Construction Economy

基  金:教育部人文社会科学研究青年基金项目资助(10YJC820048);江苏省普通高校研究生科研创新计划资助项目(CXZZ11_0182)

摘  要:施工合同价款的诉讼时效争议,具有相当的复杂性和专业性。结合相关法律、司法解释和标准合同范本的规定,并通过对有关合同价款的诉讼时效争议的典型判决进行分析,提出几点建议,以期对工程合同管理实务和相关专业人士理解施工合同中诉讼时效问题及其争议有所帮助。Limitation of actions controversial of construction contract price has complexity and professional. Connecting with relevant laws, judicial interpretation and provisions of standard sample contract, discuss some court's typical judgments about limitation of actions controversial of construction contract price, and gives some suggestions. These study results will be helpful for construction administrators and engineers and other professionals understanding the limitation and various limitation disputes under construction contracts environment.

关 键 词:施工合同 合同价款 诉讼时效 争议 

分 类 号:F407.9[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象