第三代核电站大型结构模块吊装分析  被引量:7

Lifting Analysis of Large-sized Structural Module in Third Generation Nuclear Power Plant

在线阅读下载全文

作  者:叶志燕[1] 刘建卫[1] 储艳春[1] 

机构地区:[1]上海核工程研究设计院,上海市200233

出  处:《电力建设》2012年第2期100-103,共4页Electric Power Construction

摘  要:第三代核电站大规模采用模块化建造技术,缩短建设工期的同时增加了施工难度。为将大型结构模块安全准确地吊装就位,对结构模块吊装进行有限元分析,确定模块吊装时的最大变形和应力,并对构件进行规范验算,结果表明模块能满足吊装要求。有限元分析结果为结构模块的安全就位提供强有力的理论支撑。Modular construction is widely used in third generation nuclear power plants,which shortens the construction period but increases difficulty of construction.In order to make structural module lift safely and accurately,the maximum deformation and stress for lifting modules are determined by finite element analysis.In addition,the components are evaluated standardly,showing that the modules could satisfy the lifting requirement.Results of finite element analysis provide a strong theoretical support for structural module lifting.

关 键 词:模块化 吊装 有限元分析 验算 

分 类 号:TM613[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象