深圳大运中心主体育场钢结构支撑胎架同步卸载关键问题分析  被引量:10

Analysis on Key Problems of Synchronous Unloading of Support Jigs for Steel Structures of Main Stadium in Shenzhen Universiade Sports Center

在线阅读下载全文

作  者:梁存之[1] 于滨[1] 欧阳超 陈韬 潘从建[1] 张建林[1] 冯大斌[1] 

机构地区:[1]中国建筑科学研究院,北京100013 [2]中建钢构有限公司,广东深圳518040

出  处:《施工技术(下半月)》2012年第1期5-8,共4页Construction Technology

基  金:"十一五"国家科技支撑计划课题"现代建筑技术集成示范工程建设"(2006BAJ01B08)

摘  要:深圳大运中心主体育场屋盖为单层折面空间网格结构,根据工程特点,施工时采用"先胎架拼装成型再卸载成为自承重结构"的成型方式。通过工况分析,并结合卸载施工的可操作性,提出合理的卸载施工方案。运用有限元仿真模拟,为施工监测提供依据,并针对卸载中的关键问题进行分析,并提出解决方案。施工实践表明:理论分析结果与现场监测值吻合很好。The roof of main stadium in Shenzhen Universiade Sports Center is a single-layer folded-surface spatial grid system. Based on the engineering characteristics, structure members are assembled on temporary support jigs before it could resist its gravity and other load when members integrated. The reasonable construction scheme is proposed by condition analysis and unloading maneuverability. Monitoring basis is provided by finite element simulation analysis, and the solution of the key problems of unloading are introduced. The results show that the monitoring results are consistent with theoretical analysis results.

关 键 词:钢结构 支撑胎架 卸载 有限元仿真模拟 监测 

分 类 号:TU758.11[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象