检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003
出 处:《泥沙研究》2012年第1期63-67,共5页Journal of Sediment Research
摘 要:西柳沟流域属鄂尔多斯市,是水土流失严重的地区,水土保持治理工作进展缓慢。随着鄂尔多斯社会、经济的快速增长,水资源短缺已成为制约当地经济、社会发展的屏障。受农业向工业实施水权转换的启发,由当地政府牵头、企业投资3.8亿元,在流域内修建淤地坝180座,拦截泥沙321万t。经数学模型计算和实测资料分析,工程实施后黄河干流河道减淤226万t;可置换下游河道输沙用水量2 573万m3。节省的输沙水量用于当地的工业发展。The Xiliu Gully, a small watershed located in the city of Eerduosi, is a serious soil erosion region and the soil and water conservation management is at a low level. With the development of economy and society of Eerduosi,the problem of water shortage has become a bottle neck of further development. Aroused by the exchange of water consumption right from agriculture to industry, under the leadership of the local government, supported by 0.38 billion RMB yuan from local enterprises, 180 warping dams will be built in order to retain 3.21 million tons of sediment. Based on the calculation by the mathematical model as well as the analysis of the measured data, when the dams are completely built, the amount of sedimentation reduction of the Yellow River will reach 2.26 million tons, which can save 25.73 million m3 of water used for transporting the sediment in the Lower Yellow River. The saved water will play'an important part in the development of the local industry.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4