检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹文辉
机构地区:[1]福建炼化林德气体有限责任公司,福建省泉州市泉港区362800
出 处:《深冷技术》2012年第1期12-15,共4页
摘 要:福建炼化林德气体有限责任公司2套40000 m3/h空分设备配套的空气增压机在调试过程中,级间冷却器的冷却效果不理想,冷却后的空气温度偏高。对冷却器经多次检修,仍无法达到预期效果,最后被迫更换换热管束。介绍了故障发生时级间冷却器的运行参数和故障现象,阐述故障排查和处理过程,并对该类型翅片管换热器的选型、安装和维护提出建议。During the debugging of air booster necessary for two sets of 40000 m3/h air separation plant of Fujian Refining Chemical Corporation Linde Gas Co. , Ltd. , the cooling effects of stage cooler was not ideal, the temperature of cooled air is slightly high, after several repairs, predicted effects were impossible to reach, and finally the heat exchange bank was replaced. Here, the operation parameters and trouble phenomena at trouble of stage cooler are briefed, the cause analysis and correction measures are described, and proposals are raised on selection, installation and maintenance of fin tube heat exchanger.
分 类 号:TH452[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195