220kV城市电缆及混合线路过电压及绝缘配合研究  被引量:15

Overvoltage and Insulation Coordination of 220kV Urban Cable and Hybrid Lines

在线阅读下载全文

作  者:赵丹丹[1] 张嘉旻[1] 黄华[1] 马仁明[1] 

机构地区:[1]上海市电力公司电力科学研究院,上海200437

出  处:《华东电力》2012年第2期270-274,共5页East China Electric Power

摘  要:城市电网的发展要求对城市高压电缆线路的过电压进行深入研究。详细叙述了220 kV多种电缆排列方式以及混合线路的过电压的计算分析。研究结果表明:当电缆长度大于20 km时,开关重燃后的开关断口电压过大,需要加装高压电抗器予以限制,而50 km以内的线路合闸过电压均在规程规定范围内;架空线和电缆混合线路面临的最突出问题是工频过电压,当电缆长度占总长度约20%或者40%~60%时,需采取措施限制线路切空线重燃过电压。The development of urban power grid requires the in-depth research of the overvoltage of high-voltage cable lines in cities.This paper elaborates the various arrangement modes of cables,as well as the overvoltage calculation analysis methods for hybrid lines.And the research results indicate as follows: when the cable length is over 20km,the high-voltage reactor is needed to restrict the overvoltage in switch fractures after switch restriking;when the cable length is less than 50km,the line-closing overvoltage is within the prescribed limits;when cable length is about 20% or 40%~60% of the whole line,for power frequency overvoltage,the biggest problem of overhead line and hybrid line,it is necessary to restrict the overvoltage in the case of interrupted empty line restriking.

关 键 词:220KV电缆 排列方式 电缆长度 混合比例 绝缘配合 

分 类 号:TM864[电气工程—高电压与绝缘技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象