出 处:《华东电力》2012年第2期310-312,共3页East China Electric Power
摘 要:以任丘热电厂2×350 MW超临界机组工程为例,针对厂区取水、补水流量监控采用敷设电缆成本较高、施工困难的特点,首次采用OneWireless无线网络。阐述了网络设备的配置和网络构成,提出了安装注意事项,实现与电厂DCS联网集成,消除了厂内信息孤岛,为建设数字化电厂奠定了基础。In the case of the 2×350 MW supercritical unit project in Renqiu Thermal Power Plant,this paper adopts OneWireless wireless network for the first time,considering the high cost and construction difficulties in laying cables for plant water supply and water flow monitoring.It also describes the network device configuration and network composition,and presents installation considerations.This proposed method helps to achieve network integration with the plant DCS,eliminates the plant information island,and lays the foundation of a digitalized power plant.
分 类 号:TK323[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28