红沙泉一号露天煤矿首采区及拉沟位置方案优化  被引量:15

Optimization for the first mining area and pioneer cut position scheme in Hongshaguan NO.1 cpencast coal mine

在线阅读下载全文

作  者:王忠鑫[1] 刘家纯[1] 贺永军[1] 李慧智[1] 

机构地区:[1]中煤国际工程集团沈阳设计研究院,辽宁沈阳110015

出  处:《露天采矿技术》2012年第1期1-4,9,共5页Opencast Mining Technology

摘  要:在分析了红沙泉一号露天煤矿的地质条件及煤层赋存情况等基础上,确定了首采区的大致位置,在首采区内提出了3种拉沟位置方案,并进行了优化分析,确定了合理的首采区及初始拉沟位置,研究结果对红沙泉一号露天煤矿首采区及拉沟位置方案的选择具有一定的参考价值,文中的研究思路值得其他同类型露天矿借鉴和参考。Based on the analysis on the geological conditions and coal seam conditions of the opencast, this paper pointed out the approximate location of the first mining .area. Meanwhile, the paper provided 3 options of pioneer cut position in the approximate first mining area. It determined a reasonable first mining area and the location of the pioneer cut position after optimization. The results of this study had some reference value for the design of first mining area and pioneer cut position of Hongshaquan opencast, while the research ideas of this paper can be referenced for the other same type of open pit mine.

关 键 词:首采区 拉沟位置 露天矿 红沙泉 优化设计 

分 类 号:TD824[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象