检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈海焱[1]
出 处:《电力建设》2012年第3期49-51,共3页Electric Power Construction
摘 要:电气主接线是变电站工程设计中的一项重要内容。实际工程中有几类特殊接线问题存在争议,例如:一个半断路器接线初期采用2个完整串时元件出口的隔离开关设置、一个半断路器接线在失掉双母情况下仍要保持关键联络通道、高抗回路是否设置隔离开关以及高抗回路接地开关是否可以取消等问题,针对这几个问题进行了分析,提出了相关建议。The main electrical connection is very important for the design of substations. Several special problems are analyzed and discussed in designing the 3/2 breakers connection and high voltage shunt reactor circuits. These problems include the installation of disconnectors when two complete serials are formed, the retaining of key transmission channels when two buses are cut in the 3/2 breakers connection, and the disconnector and grounding switches in high voltage shunt reactor circuits. Some suggestions with certain reference value for substation designers are proposed.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28