机构地区:[1]长江勘测规划设计有限责任公司工程建设与监理公司,湖北武汉430010
出 处:《人民长江》2012年第4期49-52,共4页Yangtze River
摘 要:针对瀑布沟水电站在初期、二期蓄水过程中发生的帷幕渗流问题,需要采取补强灌浆处理以降低帷幕渗流量。介绍了帷幕灌浆的主要施工方法和流程。针对特殊部位,包括帷幕穿越下部勘探平洞、设计帷幕底线上孔段和灌浆异常的情况,提出了主要处理措施和具体补强灌浆方案,并对蓄水过程中发生渗流的原因进行了分析。补强灌浆处理之后的监测数据表明,渗流量控制在设计允许范围内。In view of the seepage of dam curtain in the process of initial and second - phase impoundment of Pubugou Hydropower Station, reinforced grouting should be adopted to reduce the seepage discharge. The main construction method, procedure and countermeasures for special cases are introduced. According to the seepage in the initial and second - phase impoundment, the specific grouting and reinforcement scheme is proposed and the cause of seepage in the impoundment process is analyzed. The monitoring results after grouting and reinforcement show that the seepage discharge is controlled within an allowable range.
分 类 号:TV543.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38