检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨天鸿[1] 芮勇勤[1] 唐春安[1] 郑雨天[1] 申力 霍起元
机构地区:[1]东北大学,沈阳110006 [2]煤科总院抚顺分院,抚顺113001
出 处:《中国矿业》2000年第1期49-52,共4页China Mining Magazine
摘 要:本文在对抚顺西露天矿北帮E1 0 0 0边坡变形及水压动态监测资料分析的基础上 ,建立了双层渗流分析计算模型 ,依据流量平衡原理和有限元数值方法 ,进行了边坡降雨入渗量、冲积层汇水量、疏干井及放水孔涌水量计算和动态模拟 ,提出了有实际意义的疏干排水方案。实践表明 ,效果良好。This paper,on the basis of an analysis of the variant and water pressure trends monitoring record data of E1000 side slope of the Fushun Western Open pit Coal Mine,establishes the two layers seepage flow analysing and computing model;in the light of the flow balancing principle and FEM computer simulation,makes an analogue calculation and dynamic simulation of such values as penetration of rain fall into the side slope,the sink water volume of the alluvial deposit,the flow of water in the drainage well and drain holes;and puts forward a drainage and pressure reduction scheme of real significance.Practice indicates the effect is favorable.
关 键 词:渗流模型 水压动态 疏干设计 排水方案 滑移边坡
分 类 号:TD854.5[矿业工程—金属矿开采] TD824.6[矿业工程—矿山开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145