检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第三航务工程勘察设计院有限公司,上海200032 [2]同济大学地下建筑与工程系,上海200092 [3]宝山钢铁股份有限公司,上海201900
出 处:《水运工程》2012年第2期143-147,共5页Port & Waterway Engineering
摘 要:对施工期深水桩基作了基于位移的可靠度分析,采用蒙特卡洛有限元方法,计算得到桩基随地基基床系数、嵌岩深度、桩长、桩径、桩身弹性模量、桩身重度及桩顶水平荷载等参数变化的失效概率;结合可靠度计算的结果,采用模糊数学理论对桩基直接经济损失进行分析,计算得到桩基发生不同程度损失的概率,较全面系统地对施工期的深水桩基工程进行了风险分析。Based on the literature research, the method which integrates Monte Carlo simulation technique and finite element method was used to quantify the reliability of rock-socketed steel pipe pile during construction considering pile-soil interaction behavior and uncertainties in various variables. Uncertainties associated with horizontal foundation coefficients, rock-socketed length, section properties of the pile and load conditions were explicitly considered. Combining with the result of the reliability analysis, fuzzy theory was used to calculate the direct economic loss of pile during construction. The probability of pile loss of different degrees was obtained through calculation and a comprehensive and systematic risk analysis for the construction period of the deepwater pile foundation was carried out.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195