双机无等待流水作业调度算法研究  被引量:1

No-wait Scheduling of a Two-machine Flow-shop

在线阅读下载全文

作  者:陆超[1] 王丽亚[1] 

机构地区:[1]上海交通大学机械与动力工程学院,上海200240

出  处:《工业工程与管理》2012年第1期32-35,共4页Industrial Engineering and Management

摘  要:考虑双机无等待流水作业调度问题,此问题中每台机器都受一个非可用时间的约束,工件都有不同的释放时间。机器的非可用性时间间隔是部分重叠并且已知。目标使Makespan(最大流程时间)最小。通过不同的方式计算上限和下限,完善分支定界法。计算机实验结果显示了所述方法的有效性。In this paper,we consider the two-machine no-wait flow-shop scheduling problem,when each machine is subject to one non-availability constraint and jobs have different release dates.The non-availability intervals of the machines overlap and they are known in advance.We aim to find a non-resumable schedule that can minimize the makespan.We propose several lower bounds and upper bounds.These bounding procedures are used in a branch-and-bound algorithm.Computational experiments are carried out on a large set of instances and the obtained results show the effectiveness of our method.

关 键 词:流水作业调度 遗传算法 贪婪搜索 

分 类 号:TH165[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象