检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海交通大学机械与动力工程学院,上海200240
出 处:《工业工程与管理》2012年第1期32-35,共4页Industrial Engineering and Management
摘 要:考虑双机无等待流水作业调度问题,此问题中每台机器都受一个非可用时间的约束,工件都有不同的释放时间。机器的非可用性时间间隔是部分重叠并且已知。目标使Makespan(最大流程时间)最小。通过不同的方式计算上限和下限,完善分支定界法。计算机实验结果显示了所述方法的有效性。In this paper,we consider the two-machine no-wait flow-shop scheduling problem,when each machine is subject to one non-availability constraint and jobs have different release dates.The non-availability intervals of the machines overlap and they are known in advance.We aim to find a non-resumable schedule that can minimize the makespan.We propose several lower bounds and upper bounds.These bounding procedures are used in a branch-and-bound algorithm.Computational experiments are carried out on a large set of instances and the obtained results show the effectiveness of our method.
分 类 号:TH165[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63