库什塔依水电站溢洪道陡槽阶梯消能研究及设计  

Study and Design of Spillway Chute Energy Dissipation in Steps for Kushitayi Hydropower Station

在线阅读下载全文

作  者:董发俊 彭仕云 田磊 

机构地区:[1]中国水利水电第十四工程局有限公司路桥市政分公司,云南昆明650051

出  处:《云南水力发电》2012年第1期124-127,共4页Yunnan Water Power

摘  要:通过模型试验论证及以往工程应用实例,对库什塔依水电站表孔溢洪道阶梯消能初步设计方案进行优化,增设掺气槽,扩大首级台阶的宽度,使泄洪水流能量在陡槽台阶上大量削减,从而消力池长度由100m缩短至50m,节约工程投资。The preliminary design of the crest outlet spillway energy dissipation in steps for the kushitayi hydropower station is optimized according to the verification by the model test and by the living examples applied in existing hydropower projects.Provision of additional aeration grooves and increase of the width of the first step significantly reduce energy of discharging current on the chute steps,thus greatly shortening the length of the plunge pool from 100m to 50m,saving the cost of the project.

关 键 词:陡槽 阶梯消能 研究 设计 

分 类 号:TV651.2[水利工程—水利水电工程] TV653.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象