检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘喜泉[1,2]
机构地区:[1]中国长江电力股份有限公司 [2]溪洛渡水力发电厂,云南省永善县657300
出 处:《水电自动化与大坝监测》2012年第1期57-59,共3页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:三峡右岸电站压差测量系统选用了雷达水位传感器及气泡式压力水位传感器,通过测量拦污栅前后的水位,采用差分方法计算出每台机组的压差值,从测量系统结构、传感器选型、通信组网、压差测量计算等方面阐述了压差测量系统。该系统自2008年11月运行以来,其测量的三峡右岸电站每台机组的拦污栅压差值与实际值一致,现担负三峡右岸电站的机组实际出力及出力预报,拦污栅前清漂等测量预警工作。We have chosen radar water-level sensor and bubble pressure water-level sensor for the pressure difference measurement system of Three Gorges Right Bank Hydropower Plant. These water-level sensors can accurately measure the pressure difference between front and back of dirt-proof grid of each unit. And the system has been operating since November, 2008. The measured pressure difference value of dirt-proof grid of each unit is the same as actual value. The system is responsible for job of unit power output, output prediction, water-saving for increasing generation, floater removal, ete, for Three Gorges Right Bank Hydropower Plant.
分 类 号:TM621.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222