电厂循环水流道进口水力优化研究  

Hydraulic Optimization Research on the Inlet of Circulating Water Channel of Power Plant

在线阅读下载全文

作  者:王二平[1] 方进[2] 黄尊新 

机构地区:[1]华北水利水电学院水利学院,河南郑州450011 [2]华北水利水电学院水利职业学院,河南郑州450011 [3]京杭运河江苏省徐州航道管理站,江苏徐州221007

出  处:《人民黄河》2012年第3期104-106,共3页Yellow River

摘  要:为减少占地、节省工程量,某电厂循环水流道初步设计选择平面弯曲、总体长度相对较短的曲线形布置形式。应用二维紊流模型进行数值模拟,分析了流道曲线引水段弯道环流运动所产生的不利影响,为遏制弯道环流运动、调整水流流速分布,对流道进口进行水力优化,将进口前沿冷却塔人字柱支墩改造成导流墩,用以控导引水段水流运动。模型试验表明,该项措施能够有效梳理弯道段水流流向,均化流速分布,控导效果可以满足要求。In order to reduce the area and save the amount of engineering, tile form of large plane bending and relatively short overall length were taken by preliminary design in cyclical water intake channel of a typical power plant. Two-dimensional turbulent model was used to simulate, and the adverse impact caused by curved helical flow movement in the curved diversion section was analyzed. Optimal design was obtained in the entrance of intake channel for containing the helical flow movement and adjusting velocity distribution. The herringbone column of cooling tower in front of the intake channel entrance was transformed into the diversion pier to control the water flow movement of the pilot section. The model test shows that the measure can effectively dealt with the direction of the water flow in the curved section and equalize velocity distribution, and the con- trol effect can meet the requirements.

关 键 词:循环水流道 模型试验 曲线形引水段 弯道环流 导流墩设计 

分 类 号:TV674[水利工程—水利水电工程] TV675

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象