检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华中科技大学系统工程研究所,湖北武汉430074 [2]郑州轻工业学院,河南郑州450002 [3]郑州大学国际教育学院,河南郑州450052
出 处:《人民黄河》2012年第3期112-113,116,共3页Yellow River
基 金:国家自然科学基金资助项目(60773122)
摘 要:对梯级水电站水能计算方程中各要素及梯级电站丰水期、枯水期、平水期的发电水头和机组工作情况进行了研究。以某梯级水电站为例,计算了无调度和有调度时的发电效益。结果表明:在不进行调节的情况下,全年发电总量为316.75亿kW.h;在进行调节的情况下,全年发电总量为327.11亿kW.h,增发效益为2.59亿元,效益增加近3.3%。The elements of equation of hydropower computation and the water heads, operating conditions of high-water period, normal-water peri- od, and low flow period were discussed. Based on one hydropower station, generate electricity benefit with regulation and non-regulation was calcu- lated. The result shows that : with out regulation, the total energy output of hydropower station in a regulation year is 31. 675 billion kW· h ; with regulation, the total energy output of hydropower station in a regulation year is 32.711 billion kW · h; the increase value of benefit is 0. 259 billion RMB, increasing almost 3.3%.
分 类 号:TV7[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7