检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王立成[1] 马妹英[1] 刘春锋[1] 顾小兵[1]
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2012年第1期6-8,56,共3页Design of Water Resources & Hydroelectric Engineering
摘 要:采用有限元的方法,对齐热哈塔尔电站尾水渠挡墙不同工况进行了整体分析与计算。通过对墙底不同基础弹性模量的敏感性分析,并对比规范及理正计算结果,得出了对于基础弹模较小的挡土墙结构设计时,应考虑墙体的空间变形协调,并对挡土墙底板和肋板合理配置受力钢筋,对类似工程的高扶臂式挡墙的结构设计有一定的借鉴作用。Integral analysis and calculation are carried out to the retaining wall at tailrace channel of Qirehata'er Hydropower Station with finiteelement method.After sensitivity analysis of the wall base with different elastic modulus and comparison of the specifications and Lizhengsoftware calculation results,it draws a conclusion that the space deformation compatibility of retaining wall shall be considered and stressedreinforcement shall be arranged on the bottom plate and ribbed plate the retaining wall with small foundation elastic modulus.This can provide some reference for structural design of high buttressed retaining wall of similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28