检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省交通科学研究院股份有限公司,江苏南京210017 [2]中交第三航务工程局有限公司宁波分公司,浙江宁波315200
出 处:《水运工程》2012年第3期139-143,共5页Port & Waterway Engineering
摘 要:在外海高桩独立墩台工程中,尤其是海上风电场风机基础选用高桩独立墩台时,桩基础必定选用长度和直径大、受力性能好的钢管桩结构,以抵抗风机的大上拔力、大力矩和剪切力。结合上海东海大桥近海风电场工程前阶段钢管桩沉桩施工难度大、单桩锤击数多等实际情况,从桩尖结构入手以期寻找到更适用于杭州湾近海水域的地质条件下桩尖结构形式,从而提高沉桩速率。In the offshore independent pier and abutment works, especially offshore wind farm fan-based independent high-pile piers, we must use steel pipe piles with great length, large diameter and good performance, so as to resist the great pulling force, big torque and shear stress. Considering the actual situation of Shanghai Donghai Bridge Offshore Wind Farm project pre-construction stage including great difficulty in construction and much single pile hammering, we start from the pile tip structure to seek for the more suitable structural types for offshore waters of Hangzhou bay, and thus improve the rate of pile driving.
分 类 号:U655.544.1[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3