检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆伊犁库克苏河水电开发有限公司,新疆伊犁835500
出 处:《水力发电》2012年第4期51-52,共2页Water Power
摘 要:水电工程建设具有投资大,工期长,施工工序多,相互干扰大的特点。为了在保证安全和质量的前提下,按照预定的工期完成库什塔依水电站各个节点目标,必须充分发挥业主的主导核心作用,做好各项组织和协调工作,确保工程安全、质量、进度、投资、技术和环保等处于受控状态。The construction of hydropower project usually has characteristics of more investment, longer period, more process and more interference. In order to achieve the planned construction targets in the context of keeping construction safety and quality during the construction of Kushitayi Hydropower Station, the core leading role of Owner must be fully played to organize and coordinate the project construction, so as to keep the safety, quality, progress, investment, technology and environmental protection in a controlled status.
分 类 号:F281[经济管理—国民经济] TV742[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.59