检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张岩[1]
机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
出 处:《水力发电》2012年第4期73-75,共3页Water Power
摘 要:库什塔依水电站导流兼泄洪洞出口消能根据地形条件采用底流消能工消能。通过采用RNGk-ε模型模拟湍流,利用VOF法追踪自由水面,对通过物理模型试验最终确定的消力池及其辅助消能工体形进行三维流场数值模拟计算,并将物理模型试验结果与数值模拟计算结果进行对比,分析表明两者吻合较好,其结果可以为底流消能体形优化设计提供依据。The hydraulics jump is used for the outlet energy dissipation of diversion & spillway tunnel in Kushitayi I-Iydropower Station according to terrain conditions. The RNG k -ε turbulence model and VOF Method are employed to numerically simulate the 3-D flow field of stilling pool which is determined by physical model tests. The comparison of physical model test and numerical simulation shows that the difference is not apparent. The numerical simulation can provide reference for the shape design and optimization of energy dissipator.
关 键 词:底流消能 数值模拟 体形优化 导流泄洪洞 库什塔依水电站
分 类 号:TV551.1[水利工程—水利水电工程] TV651.3
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.201