检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]公主岭市平洋水库灌区管理区,吉林四平136105 [2]吉林省水务集团中部供水分公司,吉林长春130061
出 处:《吉林水利》2012年第3期56-58,共3页Jilin Water Resources
摘 要:针对渠系建筑物涵闸下游水流特点,采用一种适合于低佛氏数消能的新型消能结构-拱网消力池,并对通辽西辽河灌区洪淤渠、孟家段干渠和八一水库泻洪洞采用拱网消能的工程实例进行了分析。结果表明,与普通消力池相比,拱网消力池的池长可缩短50%以上,池深可减少约30%,且消能率可提高20%以上,一般比普通消能措施可节省工程造价30%以上。The arch net-floor stiling pond are used to many low water head hydraulic structure according to hydraulic property of canal system structure.several engeneerings examples such as hongyu canal of xiliao riv- er, mengjiaduan canal,bayi reservoir are analyzed.the results show that the long of arch net-floor stiling pond is 50 per sent of general stiling basin and the depth and engineering cost can be decrease 30 per cent compared with general stiling basin. The rate of energy dissipation are increased 20 oer cent
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.22