检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Alain Xemard Sebastien Dennetiere Ivo Uglesic Viktor Milardic Bosko Milesevic Philippe Grand Frangois Sauvegrain Pierre Stevenin Miroslav Mesic
机构地区:[1]Electricity of France, Research Division, Clamart 92141, France [2]Reseau Transport ElectricitY, Transmission System Operator, La Defense 92919, France [3]Faculty of Electrical Engineering and Computing, University of Zagreb, Zagreb 10000, Croatia [4]HEP, Transmission System Operator, Zagreb 10000, Croatia
出 处:《Journal of Energy and Power Engineering》2012年第2期267-275,共9页能源与动力工程(美国大卫英文)
摘 要:The voltage uprating of existing overhead lines is an interesting solution for increasing the transmission of electricity, especially in areas where it is difficult to build new lines. If a line is uprated with minor changes of its design and without improvement of the grounding electrodes of towers, its lightning performance remains unchanged. The consequence is that the uprated line will have a lightning flashover rate very high compared to an overhead line of same nominal voltage but of standard design. One attractive solution to solve this problem is to use line arresters. The goal of this paper is to study the use of line arresters to achieve a satisfactory lightning performance of an overhead line uprated from 225 kV to 400 kV without major design modifications. In order to compare different strategies of line arrester installation the flashover rate is calculated based on a software able to launch automatically EMTP-RV. The software named LIPS has been developed under the cover of a partnership between Hydro-Quebec, RTE and EDF.
关 键 词:LIGHTNING transmission line voltage uprating insulation coordination.
分 类 号:TM726[电气工程—电力系统及自动化] TD528[矿业工程—矿山机电]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229