“十一五”西电送广东回顾及其启示  被引量:1

Review of the West-to-Guangdong Power Transmission During the 11th Five-Year Plan Period and Its Enlightenment

在线阅读下载全文

作  者:左郑敏[1] 陈旭[2] 

机构地区:[1]广东电网公司电网规划研究中心,广州510080 [2]中国南方电网公司有限责任公司,广州510623

出  处:《南方电网技术》2012年第1期88-90,共3页Southern Power System Technology

摘  要:实施西电东送是解决广东用电需要的重要途径。回顾了"十一五"西电送广东的成效和存在的问题,就做好"十二五"及中远期广东的电源发展规划,提出如下3点建议:关注广东合理的受电比例以及本区与外区电源优势互补问题;规划好保障性电源的建设,降低广东能源对外的依赖性;积极寻求降低受电和发电成本的有效措施。The West-to-Guangdong power transmission is an important approach to meet the power demand of Guangdong.Reviewing the West-to-Guangdong power transmission during the 11th Five-year Plan Period,this paper puts forward suggestions on the power development of Guangdong in 12th Five-year period and the future as follows: to pay close attention to the rational rate of receiving power in Guangdong and the complementary advantages of both the powers from the inside and outside;to make well planning of the critical power in Guangdong so to depress its dependency on the outside power;to take more effective measures to reduce power receiving cost and generation cost.

关 键 词:西电东送 电源规划 成效 启示 

分 类 号:TM715[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象