京沪线集中修大机换枕施工技术及控制  被引量:4

Construction Technology and Control of Replacing Sleepers Using Large-scale Machinery During Beijing-Shanghai Railway Line's Centralized Repair

在线阅读下载全文

作  者:谢大伟[1] 陈利民[1] 柳传飞[2] 

机构地区:[1]上海铁路局南京桥工段,江苏南京210015 [2]江苏东南交通工程咨询监理有限公司,江苏南京210018

出  处:《盐城工学院学报(自然科学版)》2012年第1期70-74,共5页Journal of Yancheng Institute of Technology:Natural Science Edition

摘  要:就京沪线下行滁河桥大机换枕的施工组织、施工工艺、机具配备和换枕作业过程进行了详细论述,针对换枕施工提出质量控制要求,制定安全防范措施及应急预案,并思考了施工中可能遇到的关键问题,提出了改革施工工艺、加强故障处理演练和机械车辆管理的方案。This paper discusses the construction organization and technology,machines and tools and operating process in detail,proposes the quality control requirements,formulates the security protection measures and contingency plan in combination with the Chuhe Bridge's replacing sleepers using large-scale machinery at the down line of Beijing-Shanghai railway line.This paper also thinks about the key issues that may be encountered during the construction and proposes several programs such as: reforming the construction technology,strengthening the troubleshooting exercises and mechanical vehicle management for reference.

关 键 词:集中修 大机换枕 施工技术 质量控制 安全防护 

分 类 号:U216.423[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象