检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李军[1,2] 昌海泉 蒋玉双[3] 金建国[4] 鲍黎[4] 陈涛[5] 许泽勇
机构地区:[1]长江大学 [2]吐哈油田工程技术处 [3]吐哈油田丘东采油厂 [4]吐哈油田井下技术作业公司 [5]江苏盐城佳鑫石油机械厂
出 处:《新疆石油天然气》2012年第1期90-93,1,共4页Xinjiang Oil & Gas
摘 要:红台气田属低孔、特低渗气藏,具有非均质性强,纵向含气砂体叠置率高的特点,如采用前期成熟分压2层压裂管柱,完成5层压裂,需多次压井,施工周期长、储层伤害大,增产幅度有限问题,为此开展了一趟管柱分压5层先导性试验,即采用3级Y241+1级Y221封隔器组合,采用投球打开喷砂器凡事进行加砂施工,放喷结束后,逐级解封封隔器,分段解封管柱,下入生产管柱。该管柱在红台2-52井开展了先导性试验,顺利完成施工,增产效果良好。The gas reservoirs of Hongtai Gas Field are characterized by low porosity,super-Low permeability and severe heterogeneity with multilayer in vertical.If the strings for two-layer separate fracturing are taken to complete five-layer fracturing,there will be some problems,such as killing well many times,long-term construction,serious reservoir damage and the little production increasing,so a pilot testing of the string for five-layer separate layer fracturing was conducted,that is,ball-off was used to open sand blower for sand fracturing by three Y241 and a Y221,then releasing packer step by step,releasing string stage-by-stage and running the production string were carried after the end of spurting.The pilot testing of the string for five-layer separate layer fracturing was conducted successfully in Hongtai 25-2 well,which increased the gas productivity obviously.
分 类 号:TE931.2[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229