检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽宁省水利水电科学研究院,辽宁沈阳110003
出 处:《水电能源科学》2012年第4期76-78,共3页Water Resources and Power
摘 要:基于RMA2模型,以雷诺形式N-S方程为基础、以加权余量伽辽金有限元为基本求解方法,在实测地形上对河道进行概化,采用二次三角形网格离散模拟区域并进行局部加密,模拟了电场建设前后辽河滩地风机基础周边河段的水位、流速、流场分布等特性。结果表明,电场建成后对河道水位、流速影响均较小,虽存在局部绕流现象,但影响范围较小,绕流迅速消退,为电场建设和河道防洪评价提供了科学依据。Based on RMA2 model and Reynolds N-S equations, the river channel is generalized on measured terrain by taking weighted residuals Galerkin finite element as a basic solution method. And the secondary triangle mesh is applied to discrete and encrypt partially simulation domain. Then it simulates the river water level, flow velocity, flow field distri- bution characteristics around the wind generator foundation in Liaohe river overbank before and after wind power plant be- ing built. The results show that the river water level and velocity has little impact after power plant constructed although existence of local bypass flow phenomenon, the impact has a smaller range and it vanishes rapidly, which provides scien- tific basis for wind power plant construction and rive flood prevention evaluation.
关 键 词:RMA2模型 滩地 风机基础 水动力模拟 风电场
分 类 号:TV131.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222