武汉二七长江大桥钢槽梁顶推中局部应力监测与分析  被引量:1

Local stress monitoring and analysis in steel racks beam incremental launching construction of Wuhan Erqi Yangtze River Bridge

在线阅读下载全文

作  者:赵利平[1] 尹超裕[1] 肖剑[1] 张建球[1] 

机构地区:[1]长沙理工大学水利工程学院,湖南长沙410004

出  处:《交通科学与工程》2012年第1期40-45,共6页Journal of Transport Science and Engineering

摘  要:利用混合单元法,对支撑处的钢槽梁进行局部有限元仿真计算,并以武汉二七长江大桥非通航孔6×90m钢槽梁顶推工程为背景,对钢槽梁关键截面测点应力跟踪测试和处理分析.分析结果表明:顶推过程中,测点实际受力情况与有限元模拟结果吻合比较好,表明选取计算模型是可行的;支撑处钢槽梁实测最大应力未超出钢材允许应力,钢槽梁结构横桥向受力较均匀,说明施工工艺设计是合理且安全的.As a background project, the 6 X 90 m steel racks beams of the navigation spans of the Wuhan Erqi Yangtze river bridge,which were constructed with incremental launching, were simulated with the hybrid modeling for the steel racks beam on support place. The stress of the measuring points on the critical sections was measured and ana- lyzed. The results show that during the process of incremental launching, the actual stresses of measuring points are in good agreement with the simulated results, and valid- ity of the selection calculation model was proved. The measured maximum stresses of the steel racks beam on support place didn't exceed the allowable stress of steel, the stress of the steel racks beam structure is uniform in lateral direction. The design of construction technology is reasonable and safe.

关 键 词:顶推 钢槽梁 混合建模 局部应力 应力监测 

分 类 号:O319.56[理学—一般力学与力学基础]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象